13–14 T/H organic fertilizer processing plant in Saudi Arabia

Organic Fertilizer Processing Plant In Saudi Arabia

This organic fertilizer processing plant in Saudi Arabia was completed for a biotechnology company. Its annual product programme was 50,000 tonnes, divided between 20,000 tonnes of powder and 30,000 tonnes of pellets. The 13–14 T/H class described their combined finishing duty.

Cattle and sheep manure formed the organic feedstock. Purchased material had already undergone preliminary fermentation before receiving. Further aerobic treatment and maturation prepared it for the two product branches, followed by checks appropriate to the product being packed.

Powder needed crushing, screening and weighing. Pellets required additional forming, two drying stages, two cooling stages and final sizing. Separate packing scales kept the two products moving toward dispatch.

Some cooled granular batches also received biological agents and mineral additions. This step took place after thermal finishing and followed the grade ordered by the buyer.

The annual product split assigned 40% to powder and 60% to pellets. At the upper combined finishing point, this represented 5.6 T/H of powder and 8.4 T/H of finished pellets. The pellet press therefore served the granular share rather than the whole combined rate.

The organic fertilizer production project had a total staffing provision of eight people. The line calendar comprised three eight-hour shifts on each of 300 working days, giving 7,200 scheduled hours annually. Staffing was stated for the project as a whole.

Calendar or output measureCalculated valueBasis
Scheduled line hours7,200 hours/yearThree shifts for 300 days
Time at 13 T/H combinedAbout 3,846 hours50,000-tonne programme
Time at 14 T/H combinedAbout 3,571 hours50,000-tonne programme
Powder share at 14 T/H5.6 T/H40% of combined product
Pellet share at 14 T/H8.4 T/H60% of combined product

combined production capacity

project investment

location

project type

The organic fertilizer processing plant in Saudi Arabia occupied a 5,742 m² site with 5,570 m² of listed building floor area. Production, fermentation and staff-support spaces were included in that floor-area total.

The 3,870 m² production workshop held both finishing routes. The 1,440 m² fermentation bay served manure treatment. An office, staff rest room and parts room completed the five floor-area components.

Building componentFloor areaMain function
Production workshop3,870 m²Powder and pellet routes
Fermentation bay1,440 m²Material treatment
Office150 m²Administration
Staff rest room80 m²Staff support
Parts room30 m²Store service parts
Listed floor area5,570 m²All five components

Both products used 40 kg bags. The powder programme required 500,000 bags annually, while pellets required 750,000. This gave the packing section a clear product split as well as a combined bag requirement.

Finished productAnnual programme40 kg bags
Powder fertilizer20,000 tonnes500,000 bags
Fertilizer pellets30,000 tonnes750,000 bags
Combined product50,000 tonnes1,250,000 bags

Product checks covered organic matter, nutrients, pH and moisture. The criteria below were product references. Release followed the specification for the grade being sold and the relevant batch results.

Product-reference itemCriterionCheck basis
Organic matterAt least 45%Dry basis
N + P₂O₅ + K₂OAt least 5% combinedDeclared nutrient analysis
pH5.5–8.5Product testing
Powder moistureNo more than 30%Before powder release
Granular outlet moistureAbout 10%Second-stage reference

These reference criteria did not replace the specification for a particular sale grade. Required contaminant, maturity and biological-grade checks followed the product being offered. A biological declaration required the appropriate finished-product evidence after application and packing.

The organic feed was cattle and sheep manure from farms and individual suppliers. Receiving used a 50–55% moisture reference for the preliminarily fermented material. Pig and chicken manure were excluded from this project’s stated feedstock.

Material provisionAnnual allowanceApplication
Cattle and sheep manureIntake follows dry-matter accountPrimary organic feed
Fermentation agent800 kgTreatment preparation
Biological agents10 tonnesSelected cooled granular batches
Mineral additions1,500 kgSelected product recipe

At 30% powder moisture and 10% pellet moisture, the annual product programme contained 41,000 tonnes of non-water material. Gross manure intake had to cover that requirement and treatment losses, allowing for the small purchased additions. Receiving moisture and treatment yield determined the intake account.

What each purchased addition did

The fermentation agent belonged to manure treatment. Biological and mineral additions belonged to selected finished-product recipes. Their different application points kept heat treatment separate from the final biological addition.

Purchased additionSupplied formProduction distinction
Fermentation agent50 kg bagsFollow supplied formulation
Biological preparation20 kg bagsPost-cooling application
Zinc manganese and copperMineral additionsTrace nutrients
Calcium and magnesiumMineral additionsSecondary nutrients

The biological preparation identified Bacillus subtilis and Bacillus licheniformis among its supplied organisms. Addition after the heat stages kept that operation distinct from thermal finishing. Product handling and final testing remained relevant to the declared biological grade.

Preparation and powder finishing shared the initial material route. The granular branch used one appropriately sized ring-die fertilizer-forming position, followed by the listed two-stage drying and cooling arrangement. The equipment groups below separate these duties.

Preparation equipmentQuantityDuty
Feed hoppers6Hold branch feed
Horizontal crushers2Prepare powder and granular feed
Aerobic turner1Turn treatment material
Mobile material handler1Charge and move material
Sweeper1Workshop cleaning
Granular-stage equipmentQuantityDuty
Organic Fertilizer Pellet Making Machine1Ring-die fertilizer forming
First dryer1Initial water removal
First cooler1First-stage air cooling
Second dryer1Final moisture adjustment
Second cooler1Cool before additions
Natural-gas hot-air furnaces2Supply drying heat
Biological-addition tank1Treat selected cooled batches
Sizing and packing equipmentQuantityDuty
Branch preparation screens2Powder and granular preparation
Final granular screen1Size cooled pellets
Packing scales2Separate product branches
Belt conveyors10Transfer process material

The process first brought received manure to the required treatment and maturity condition. Prepared material then entered the appropriate product branch. On the granular route, biological additions followed the heat stages and cooling.

Receive and manage aerobic treatment

Cattle and sheep manure arrived by enclosed road transport after preliminary fermentation. Receiving checks covered its identity, moisture and treatment condition. The accepted material entered the designated fermentation bay for the remaining aerobic preparation.

The fermentation agent was prepared and applied according to its supplied formulation and batch instructions. Its annual allowance was a purchased mass, while the application dose depended on the supplied preparation.

Added water followed incoming moisture and the agent’s instructions. Treatment water was recorded separately from water added later during granulation.

The material handler placed and moved manure in the treatment bay. The aerobic turner turned the material, with space maintained for access and transfer.

Temperature and material condition guided turning. Maturity checks determined when the material could move onward.

The amount held for treatment had to fit the bay and its handling arrangement. Treatment inventory and release scheduling governed the supply available to finishing.

Mature the material before branch feeding

After aerobic preparation, the manure continued through maturation in the treatment area. Released material then moved to the feed hopper.

The prepared-material moisture reference was 30–35%. Powder release required the powder moisture criterion to be met before packing. Material at the wet end of the preparation range was therefore assessed for further conditioning or its appropriate downstream route.

Transfer prepared material to the feed hopper

The material handler charged the receiving hopper. Its 4 m by 1.5 m plan dimensions described its footprint. The hopper supplied the branch feed arrangement.

Direct material to powder or granular production

Two outlets below the feed hopper connected to the two crushing routes. The selected outlet directed material toward powder finishing or pellet preparation.

Powder crushing screening and packing

The powder route used a horizontal crusher and screening machine before enclosed transfer to the packing scale. Screening controlled the accepted powder fraction, while the material released to the scale also had to meet the moisture requirement for the powder grade.

The powder scale weighed directly into 40 kg bags. Filled bags moved to storage for dispatch. Powder output was recorded separately from granular output.

Pellet preparation forming and finishing

Crush the granular feed

Crushing prepared matured manure for forming. Particle condition affected feeding and pellet consistency, so the granular branch retained its own preparation machine.

Enclosed transfer delivered material to the horizontal crusher. Crushed material then moved to the branch screen.

Screen prepared material

The branch screen separated suitable feed for forming. Recoverable material outside that preparation specification stayed in the preparation circuit.

Adjust moisture and form pellets

Prepared material moved by enclosed conveying to the organic fertilizer granulator machine. A ring-die forming arrangement served the granular branch. Its selection followed the wet feed passing through forming and drying, as well as the required finished-pellet rate.

The water supply to the organic fertilizer pellet mill adjusted the forming material as required. Moisture at this point affected press feeding and the drying load. The water account belonged to the granular route and was kept separate from the powder programme.

The granulation-water reference was 40 litres per tonne of material entering that stage. It was applied to the appropriate granular feed quantity, with adjustment for measured inlet moisture. It did not define the water requirement of every tonne received by the whole project.

The die and rollers formed pellets from the prepared manure-based blend. Controlled feeding helped maintain a steady material supply.

New pellets transferred to drying. Their wet quantity included water that would leave in the next stages, so it exceeded the corresponding finished-pellet quantity.

Apply the first drying and cooling stage

The first dryer used natural-gas hot air. Its process references were 160–180°C drying air and 10–30 minutes of treatment, with material moisture moving from about 35% toward 25%. These were operating references for adjustment to the actual material condition.

Air cooling followed the first dryer. Material moisture and condition at transfer set the next heat stage’s operating requirement.

Complete drying and cool the pellets

The second dryer provided further water removal using natural-gas heat. The stated process reference was about 200°C drying air with roughly ten minutes of treatment. Its purpose was to reach the specified granular outlet condition after the first drying stage.

The second-stage moisture reference moved from about 25% to 10%. Pellets then passed through the second air-cooling stage before final screening and any biological additions. Cooling preceded product holding and bagging.

Size the cooled granular product

Final sizing separated accepted pellets from suitable recoverable material. Accepted product met the selected size and handling criteria; recoverable off-size material returned to preparation.

Add biological agents to selected cooled batches

Selected cooled granular batches entered the addition tank for biological agents and mineral additions. Application followed the product recipe and the agent’s temperature conditions. Where a biological grade was declared, the relevant finished-product testing supported that declaration.

Weigh and bag granular product

The granular scale filled 40 kg bags with accepted pellets. The packed quantity belonged to the 30,000-tonne annual pellet programme.

The organic fertilizer production line included powder preparation screening, granular preparation screening and final pellet sizing. Suitable returns stayed inside their assigned process circuit. They were not counted again as fresh purchased manure or additional finished product.

Keep the water quantities on their proper bases

A sweeper served workshop cleaning. Water for agent preparation, granulation and staff use followed separate calculation bases.

Granulation water followed the measured feed entering that stage and its moisture. The 40-litre-per-tonne reference applied to that flow. Drying removed water later in the route.

The staff-water provision was 40 litres per person per working day. For eight staff and 300 working days, this equalled 96 m³ annually. This calculation described the personnel allowance separately from production and treatment additions.

Match the granular heat duty to wet material flow

At the 14 T/H combined finishing point, the 60% pellet share was 8.4 T/H of finished pellets. Using the 35% forming-stage and 10% final moisture references gave about 11.63 T/H before drying, on a constant non-water-material basis.

The granular forming arrangement was sized around this wet flow. Recipe, die, preparation and internal returns also affected its required capacity.

For the annual pellet programme, the same reference gave about 41,538 tonnes before drying and 36,000 tonnes after the first stage. The difference to the final 30,000 tonnes described reference water removal before considering later additions and other balance movements.

Electrical and natural-gas planning allowances

The electrical planning allowance was 1,000,000 kWh annually. Natural-gas provision for the heat stages was 1,080,000 m³ annually. These annual quantities described utility planning; drive loading, heater duty and productive time determined the operating requirements.

For an organic fertilizer processing plant in Saudi Arabia, give RICHI the manure condition, required powder-to-pellet split and intended product grades. Add the annual programme, working calendar and bag size so that treatment, wet forming, thermal finishing and packing can be sized on consistent material bases.

Consultation and Definitions
Winery Residue Fertilizer Project in Italy
Equipment Manufacturing
equipment testing
Equipment delivery
Operator Training
Wood Pellet PlantWorkshop

Who we are

RICHI Machinery is one of the world’s leading suppliers of technology and services for the animal feed, aqua feed and pet food industries, also the largest pellet production line manufacturer in China.

Since 1995, RICHI’s vision to build a first-class enterprise, to foster first-class employees, and to make first-class contributions to society has never wavered.

In the past three decades, we have expanded our business to a wide range of areas, including animal feed mill equipment, aqua feed equipment, pet feed equipment, biomass pellet equipment, fertilizer equipment, cat litter equipment, municipal solid waste pellets equipment, etc.

Email email
WhatsApp whatsapp
Get Quote!

LEAVE YOUR NEEDS

Keeping in touch with us is an effective way to solve all your problems. If you have any needs or questions, please leave your contact information, then RICHI technical consultants will send design, quotation, videos to your mailbox. You can also contact us directly via WhatsApp: +86 138 3838 9622

    Application:

    * We will store the information you have provided us. We will only use this information for the purpose of helping to answer your inquiries. We will not disclose your information to third parties.

    +
    Scroll to Top