Organic Fertilizer Processing Plant In Saudi Arabia

RICHI MACHINERY
overview
The main product processed in this organic fertilizer processing plant in Saudi Arabia project is biological organic fertilizer.
Biological organic fertilizer refers to organic fertilizer containing a certain amount of functional microorganisms, which is made from organic waste such as animal manure, humic acid, and crop straw, and is processed with multifunctional fermentation agents. It has the advantages of comprehensive nutrients, fertilizer and water conservation, soil improvement, crop growth promotion, and agricultural product quality improvement, and is called environmentally friendly fertilizer.
According to relevant data, my country’s fertilizer use is nearly 200 million tons, accounting for 28% of the world’s use. The fertilizer use per unit farmland area is twice that of developed countries, while the utilization rate of organic fertilizer is only 50% of that of developed countries.
Due to unreasonable and unscientific fertilizer application, not only resources are wasted and agricultural costs are increased, but also soil is destroyed, the environment is polluted, and the survival of animals and plants and human health are threatened.
It is imperative to apply fertilizers scientifically, reasonably, and reduce pollution, and replace traditional single-element inorganic fertilizers with high-quality biological organic fertilizers.
In view of this, the client of the project, a Saudi Arabian biotechnology company, invested 630,000 US dollars to build an annual production of 50,000 tons of organic fertilizer production project. The organic fertilizer processing plant in Saudi Arabia project has a labor quota of 8 people, three shifts, 8 hours a day, and an annual production time of 300 days.
13-14T/H
capacity
630,000 USD
investment
Saudi Arabia
location
Fertilizer
project type
RICHI MACHINERY
Main construction content
The organic fertilizer processing plant in Saudi Arabia project covers an area of 5742m2 and a total construction area of 5570m2.
The construction content includes production workshops, warehouses, offices, accessories rooms, temporary rest rooms for employees and their supporting facilities. The project engineering content is detailed in the table below.
Engineering classification | Engineering name | Construction content | Number of floors | Remarks |
Main engineering | Production workshop | 1, with a construction area of 3870m2, including granulation production, granule packaging area, weighing area, and finished product storage area. | 1 floor | Colored steel structure |
Trough fermentation workshop | 1, with a construction area of 1440m2, mainly for aerobic fermentation and aging fermentation. | 1st floor | Colored steel structure | |
Storage and transportation engineering | Raw material storage | Cow and sheep manure is directly transported to the tank fermentation workshop in the factory for fermentation, and is not stored in other locations in the factory; other bagged raw materials are stored in the production workshop. | — | — |
Finished product storage | Bagged finished products are stored in the finished product storage area in the production workshop. | — | — | |
Transportation | Raw materials mainly rely on social transportation forces and are transported by closed vehicles; transportation within the factory is mainly transported by forklifts and closed conveyor belts. | — | — | |
Auxiliary Engineering | Office | 150m2, for daily office | 1st floor | brick-concrete structure |
Staff Lounge | 80m2, for temporary rest | 1st floor | brick-concrete structure | |
Accessories Room | 30m2, for storing equipment accessories | 1st floor | brick-concrete structure |
RICHI MACHINERY
Product plan
The main products and annual output of this organic fertilizer processing plant in Saudi Arabia project are shown in the table below.
No. | Name | Specifications | Production Scale | Remarks |
1 | Biological Organic Fertilizer | 40kg/bag | 20000t/a | Powdered Organic Fertilizer |
2 | 30000t/a | Pelletized Organic Fertilizer |
RICHI MACHINERY
Technical indicators of organic fertilizer products
The technical indicators of the biological organic fertilizer products produced by this organic fertilizer processing plant in Saudi Arabia project are shown in the table below.
Item | Indicator |
Mass fraction of organic matter (on a dry basis), % | ≥45 |
Mass fraction of total nutrients (ammonia + phosphorus pentoxide + potassium chloride) (on a dry basis), % | ≥5.0 |
Mass fraction of water (fresh sample), % | ≤30 |
Acidity, p H | 5.5~8.5 |
Number of fecal coliform bacteria, pieces/g | ≤100 |
Ascaris egg mortality, % | ≥95 |
Total arsenic (As) (on a dry basis) | ≤15 |
Total mercury (Hg) (on a dry basis) | ≤2 |
Water content, % | ≤30.0 |
pH | 5.5~8.5 |
Fecal coliform count, pieces/g | ≤100 |
Ascaris egg mortality, % | ≥95 |
Validity period, months | ≥6 |
RICHI MACHINERY
Main raw and auxiliary materials and energy consumption
The raw materials of this organic fertilizer processing plant in Saudi Arabia project are mainly cattle and sheep manure, and pig manure and chicken manure are not used. The raw materials come from farms and individual farmers. The consumption of main raw and auxiliary materials is shown in the table below.
No. | Raw material name | Consumption | Packaging method | Remarks |
Raw and auxiliary materials | ||||
1 | Cow and sheep manure | 54000t/a | Bulk | The purchased cow and sheep manure is dehydrated or dried and preliminarily fermented, with a moisture content of 50%~55%. |
2 | Fermentation agent | 0.8t/a | Bagged, 50kg/bag | Fermentation functional bacteria |
3 | Biological bacteria Agent | 10t/a | Bag, 20kg/bag | Bacillus subtilis, Bacillus licheniformis and other functional bacteria |
4 | Trace elements | 1.5t/a | Bag, 20kg/bag | Zinc, manganese, copper, calcium, magnesium |
5 | Product packaging bags | 1.25 million/a | — | — |
Energy consumption | ||||
1 | Fresh water | 2376m3/a | Supplied by the water supply network | |
2 | Electricity | 1 million KWh/a | Supplied by power supply lines | |
3 | Natural gas | 1.08 million m3/a | Transported by natural gas supplier tank trucks |
Physical and chemical properties of raw materials
The physical and chemical properties of the main raw materials for this organic fertilizer processing plant in Saudi Arabia project are shown in the table below.
No. | Name | Main physical and chemical properties |
1 | Fermentation agent | Probiotics, lactic acid bacteria, yeast, photosynthetic bacteria, Gram-positive actinomycetes and other beneficial microorganisms are fermented through special processes and are rich in active ingredients such as various microorganisms and metabolites, organic acids, amino acids, small molecule biological peptides, and beneficial growth factors. |
2 | Biological agent | The new biological strain with the trait of powder has the characteristics of rapid reproduction, strong vitality, safety and non-toxicity. Characteristics: pure strain, high number of viable bacteria, no foreign bacteria; promote the growth of crops, improve the quality of agricultural products, and prevent diseases; improve soil and dissolve ineffective phosphorus; high temperature resistance, no inactivation during granulation and drying, and can be stored for a long time. |
3 | Trace elements | Trace elements refer to chemical elements with very low content in nature. Some trace elements have biological significance and are necessary for the normal growth and life of plants and animals. They are called “essential trace elements” or “trace nutrients”, usually referred to as “trace elements”. Applying trace element fertilizers is conducive to increasing yields. |
RICHI MACHINERY
Main equipment for organic fertilizer processing plant in Saudi Arabia
The main equipment of this organic fertilizer processing plant in Saudi Arabia project is detailed in the table below.
No. | Equipment Name | Specification Model | QTY |
1 | Collective Hopper | 4m×1.5m | 6 |
2 | Horizontal Crusher | — | 2 |
3 | Organic Fertilizer Pellet Making Machine | YZ-3500 Type | 4 |
4 | First fertilizer dryer | 2.2m×20m | 1 |
5 | First fertilizer granule cooler | 2.0m×20m | 1 |
6 | Second fertilizer dryer | 2. 0m×20m | 1 |
7 | Second fertilizer granule cooler | 1.8m×18m | 1 |
8 | Bacteria tank | JJG-100 | 1 |
9 | Screening machine | FS-2200 Type | 1 |
10 | Packaging scale | KL-400 | 2 |
11 | Hot air drying furnace (matching burner) | RSJ-240 | 2 |
12 | Screening machine | FS-2000 Type | 2 |
13 | Wheel hydraulic tipping machine | KD-1800 type | 1 |
14 | Forklift | ZL-50-ZN | 1 |
15 | Material conveying belt | KD-60 type | 10 |
16 | Sweeper | Mini-100 | 1 |
Total | 36 |
RICHI MACHINERY
Process design of Saudi Arabia organic fertilizer production line project
Process flow of this organic fertilizer processing plant in Saudi Arabia project:
(1) Aerobic fermentation
Buy cattle and sheep manure (water content 50% to 55%, and has undergone preliminary fermentation) is transported to the factory by sealed vehicles.
After entering the factory, it does not need to be aired and directly enters the fermentation workshop to spray the fermentation agent. Generally, 0.025L of fermentation agent is sprayed on 1t of manure.
In order to spray the agent evenly, the agent must be poured into a bucket and diluted with water by about 1000 times (1L of fermentation bacteria is diluted to 1000L with water, that is, 1t of manure is sprayed with 25L of diluted agent), and the diluted agent is sprayed on the surface of cattle and sheep manure with a spray gun.
Use a forklift to turn the sprayed sheep manure evenly and pile it into strips for aerobic composting fermentation (the fermentation form of this project is strip-type aerobic turning fermentation, that is, the fertilizer is piled into a long row to increase the contact area between the fertilizer and the air).
As the aerobic fermentation time increases, the temperature of the fertilizer pile gradually increases.
When the temperature of the fertilizer pile reaches 60℃~65℃, a turning machine is needed to turn the fertilizer so that the fertilizer in the pile core is fully in contact with the air and the efficiency of aerobic fermentation is improved. The pile is turned 1~2 times a day and fermented continuously for 20~25 days.
(2) Aging and fermentation
After the aerobic fermentation is completed, aging and fermentation are required. Both aging and aerobic fermentation are carried out in the tank fermentation workshop, that is, the fertilizer is pushed into a large pile by a forklift for further fermentation and maturation.
The aging and fermentation time is 10 days. A large amount of water is evaporated during the fermentation process, and the moisture content of cattle and sheep manure is reduced to 30%~35% after fermentation and maturation.
(3) Loading
The fermented cattle and sheep manure is sent to the collecting hopper by a forklift.
(4) Branching
The products of this organic fertilizer processing plant in Saudi Arabia project have two specifications, one is granular fertilizer and the other is powder fertilizer. Therefore, after the raw materials are mixed, they need to be branched to the corresponding production line to produce products of corresponding specifications. Two discharge ports are set below the upper hopper, which are connected to two crushers respectively.
① Powder production
The raw materials enter the horizontal crusher for crushing, then screened by the screening machine, and then sent to the packaging scale through a closed conveyor belt.
After quantitative measurement and packaging by the packaging scale, they are bagged and stored (the bag mouth is directly put on the discharge port of the packaging scale, and the product is directly put into the bag without falling to the ground).
② Granular material production
A. Crushing
In this organic fertilizer processing plant in Saudi Arabia project, in order to make the granulated fertilizer more uniform and smooth, the cattle and sheep manure to be granulated needs to be crushed.
The cattle and sheep manure to be granulated arrives above the horizontal return material crusher with the belt, falls from the feed port of the horizontal return material crusher into the horizontal return material crusher, closes the feed port of the horizontal return material crusher, and crushes.
B. Screening
The crushed raw materials enter the screening machine for screening, and the raw materials that meet the specifications are screened out.
C. Granulation
The screened raw materials are transported to the organic fertilizer granulator machine by a closed conveyor belt for granulation.
During the granulation process, the fully automatic water supply system sprays water into the organic fertilizer pellet mill to make the raw materials moist and facilitate granulation.
The water spraying amount per ton of raw materials is 40L. The cattle and sheep manure is degassed and spirally pre-compressed in the granulator and transported to the arc-shaped notch of the two rollers.
The two rollers rotate at the same speed and in opposite directions, bite the material into the groove and compress it by force.
The pressure on the material after passing through the compression zone gradually decreases, and its surface tension and gravity make it naturally escape to form particles.
D. First drying and first cooling
In this organic fertilizer processing plant in Saudi Arabia project, the granulated cattle and sheep manure is transported to the first dryer by a closed conveyor belt for drying. The first drying temperature is 160-180℃ and the drying time is 10-30min. After the first drying, the moisture content of the material is reduced from 35% to 25%.
The first drying is heated by a natural gas hot air drying furnace. The dried material enters the cooler for cooling. The cooling method is air cooling, and no wastewater is generated. After the material cools to room temperature, it enters the next process.
E. Second drying and second cooling
In order to further reduce the moisture content in the material, the cow and sheep manure after the first drying is transported to the second dryer for drying by a closed conveyor belt. The second drying temperature is 200℃ and the drying time is about 10 minutes.
After the second drying, the moisture content in the material is reduced from 25% to 10%. The second drying is heated by natural gas. After the second drying, the material enters the cooler for cooling. The cooling method is air cooling. After the material cools to room temperature, it enters the next process.
F. Screening
The dried raw materials are screened again, and the pellets that meet the specifications are screened out and enter the next process.
G. Adding biological agents and trace elements
In this organic fertilizer processing plant in Saudi Arabia project, according to customer needs, some granular materials are transported by conveyor belts to the bacteria tank to add biological agents and trace elements.
H. Weighing and packaging
After screening, the pelletized materials are sent to the packaging scale by a closed conveyor belt according to the particle size. After quantitative measurement and packaging by the packaging scale, they become finished products.
This organic fertilizer production line project involves three screening processes in the production process. The unqualified products screened out are returned to the feeding process for production.
RICHI MACHINERY
Public works
Water supply:
The workshop cleaning of this organic fertilizer processing plant in Saudi Arabia project is carried out by a sweeper. There is no need to wash the workshop floor with water. The production water is granulation water and raw material transportation vehicle washing water.
Vehicles transporting cattle and sheep manure need to wash their wheels and bodies when entering and leaving the tank fermentation workshop. According to the information provided by the construction unit, the amount of washing water generated is 2m3/d and 600m3/a.
During the production process, the granulation process sprays water into the disc granulator. This project requires 40L of water per ton of raw materials, and the water consumption is 7.2m3/d and 2160m3/a, which is composed of vehicle washing wastewater and fresh water. The amount of fresh water added is 5.6m3/d and 1680m3/a.
This project does not have a canteen, and domestic water is used for washing of employees. T
he labor quota of this project is 8 people, and the water consumption is calculated at 40L/person·d, so the domestic water consumption is 0.32m3/d and 96m3/a. In summary, the total water consumption of this project is 7.92m3/d and 2376m3/a.
Drainage:
The amount of vehicle washing wastewater generated is 80% of the water consumption, 1.6m3/d, 480m3/a, and flows into the sedimentation tank on the west side of the trough workshop through the drainage ditch for sedimentation treatment.
The washing wastewater mainly contains cattle and sheep manure, and the main pollutant is SS. After precipitation, it contains a small amount of SS, which is all reused for granulation in the granulator; the raw materials in the granulator are cattle and sheep manure, and the water quality requirements for the granulator are not high, so the wastewater reuse is feasible.
The water added in the granulator is all evaporated, and there is no wastewater discharge during the production process.
Domestic sewage is the staff’s washing wastewater, and the amount is calculated as 80%, which is 0.256m3/d and 76.8m3/a, all of which are used for dust suppression in the factory area.
The factory area is equipped with anti-seepage dry toilets, and the feces and sewage in the dry toilets are cleaned by local farmers and used as agricultural fertilizer.
(3) Power supply
The electricity used in this organic fertilizer processing plant in Saudi Arabia project is provided by the local power supply line, with an annual power consumption of about 1 million kW·h, which can meet the power demand of this project.
If you are interested in our organic fertilizer processing plant in Saudi Arabia project, feel free to contact RICHI MACHINERY to customize the production line process plan and equipment configuration plan for free, and design civil engineering, equipment layout and other plans according to your factory building.
● RICHI MACHINERY
RICHI Service

● Consulting
Customer Consultation
We want to have a deep understanding of your industrial process, to know your exact needs of feed, wood, biomass, fertilizer or other pellet processing.

● Design
organic fertilizer Plant Design
Based on your unique situation and industrial process, we will tailor complete pellet plant you need, and inform you of every additional detail that could facilitate operation, minimize total cost.

● Manufacturing
Equipment Manufacturing
The critical components of the of the complete pellet production line equipment are built in our own workshops in Asia. Additional equipment is manufactured by our worldwide network of reliable partners.

● Testing
Quality Inspection & Testing
Before leaving the factory, all equipment will be inspected by the quality inspection department. We can also provide customers with testing services from a single machine to a complete pellet plant system, and provide you with real actual data for “worry-free use.”

● Delivery
Equipment Delivery
In equipment boxing and packaging, we adopt professional packaging and modular solutions to ensure the safe and non-destructive delivery of pellet plant equipment.

● Installation
Installation & Commissioning
Whether you choose your own subcontractor for the erection phase or you want to install everything together with us, a Richi supervisor will be around to make sure everything is mounted in a safe and thorough way.

● Training
Staff Training
We provide comprehensive training for the technicians of each organic fertilizer processing plant in Saudi Arabia project. We can also continue to provide support for the technicians during latter project operation.

● After-sales
Project Follow-Up
When everything is up and running our Richiers will help you further whenever needed. We are ready to answer your call 24/7.We’ll also visit you regularly to learn about your needs.

Who we are
RICHI Machinery is one of the world’s leading suppliers of technology and services for the animal feed, aqua feed and pet food industries, also the largest pellet production line manufacturer in China.
Since 1995, RICHI’s vision to build a first-class enterprise, to foster first-class employees, and to make first-class contributions to society has never wavered.
In the past three decades, we have expanded our business to a wide range of areas, including animal feed mill equipment, aqua feed equipment, pet feed equipment, biomass pellet equipment, fertilizer equipment, cat litter equipment, municipal solid waste pellets equipment, etc.

1995
RICHI Established

2000+
Serving More Than 2000 Customers

120+
RICHI Employees

140+
Exported To 140 Countries