On May 6, RICHI engineers arrived at the Ecuador organic fertilizer production line project site and will soon begin installation guidance. According to the current construction status of the organic fertilizer processing plant project, RICHI engineers reported the current organic fertilizer pellet mill plant project construction progress to RICHI headquarters.

Up to now, the project has completed site leveling and factory frame construction, production equipment has been purchased and transported, and fermentation tanks, conveyor belts and other equipment are being installed. The project is expected to be completed and put into use before the end of July.

Organic fertilizer production mainly uses animal manure, biogas residue, straw, etc. as raw materials, and does not contain any chemical components. The main substance in organic fertilizer is organic matter, which can improve the physical, chemical and biological properties of the soil, mature the soil, fertilize the soil, and improve soil fertility. The absorption performance, cushioning performance and stress resistance performance.

After the organic fertilizer factory project is completed, an interest linkage mechanism will be established with local farms and orchards. The special fertilizer produced by the organic fertilizer processing plant will be sold to local users at a price lower than the market price according to the same nutrient content standards. It can save management costs from the source, promote efficiency and increase income, and can also effectively control the amount of fertilizer application, reduce pollution to soil and water sources, and ensure soil fertility.

Send us a message
X Send us a message

    Application:

    * We will store the information you have provided us. We will only use this information for the purpose of helping to answer your inquiries. We will not disclose your information to third parties.

    Leave Message
    Whatsapp