Kazakhstan 10 T/H Alfalfa Pellet Plant Nears Handover After Final Commissioning Runs

A new 10 t/h alfalfa pellet plant in Kazakhstan is approaching handover as RICHI Machinery engineers and the customer’s operating team complete the final extended production runs.

The facility has already produced both 6 mm and 8 mm forage pellets from locally sourced dried alfalfa. Current work is focused on production continuity, operator independence and the response of the line when the physical condition of the forage changes.

The project has therefore entered a very different stage from initial startup.

08:10 — Incoming Alfalfa Checked Before the Line Starts

The day’s commissioning work begins at the raw-material side.

Operators inspect moisture and the condition of the prepared alfalfa before feeding starts. Stem fraction, leaf content and fines can vary among forage batches, even when all of them are sold under the same general description of dried alfalfa.

The objective is not to reject every variation, but to understand what has entered the factory before machine settings are changed.

10:20 — Production Load Raised Gradually

After material flow stabilizes, feeder output is increased in stages.

Motor load and pellet formation are observed together.

The team avoids jumping directly from idle operation to the highest feed rate because a gradual increase makes it easier to identify where instability begins.

During these runs, the customer operators are making more of the adjustments themselves while RICHI engineers observe and intervene only when necessary.

13:40 — 6mm Production Changes to 8mm

The switch between the customer’s two principal commercial pellet specifications provides another commissioning test.

The larger pellet does not automatically use the same production parameters as the 6 mm product.

Feed rate, machine load and downstream cooling behavior are checked again after the change.

The practical hourly output can also differ between the two specifications.

16:15 — Screening Return Is Reviewed

Attention moves downstream after several hours of production.

The team checks the proportion and condition of material returning from screening.

Higher fines do not automatically mean that the screen itself is the problem. Raw-material preparation, moisture, pellet formation and handling can all contribute.

Operators are being trained to trace the production route before making an adjustment.

18:00 — Shift Ends with Operator Review

The day’s production data and observations are reviewed with the Kazakhstan team.

By this stage, training is less about explaining what each machine does and more about making operating decisions when the forage changes.

The plant is already capable of producing alfalfa pellets. Final commissioning is intended to establish whether the local team can keep it producing consistently without continuous engineer intervention.

Once the remaining extended runs are completed, the 10 t/h alfalfa pellet production line project will move into formal handover and routine commercial production.

Email email
WhatsApp whatsapp
Get Quote!

LEAVE YOUR NEEDS

Keeping in touch with us is an effective way to solve all your problems. If you have any needs or questions, please leave your contact information, then RICHI technical consultants will send design, quotation, videos to your mailbox. You can also contact us directly via WhatsApp: +86 138 3838 9622

    Application:

    * We will store the information you have provided us. We will only use this information for the purpose of helping to answer your inquiries. We will not disclose your information to third parties.

    +
    Scroll to Top